Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Feb 08, 2024     43-8 Cabin Cover step 5-7 - (3 hours) Category: Fuselage
Sanded the epoxy/Flox to at least 3/8" clearance to the top of the flange (1/4" for the plexiglas and 1/8" for sikaflex). Used belt sander and permagrit files. Transition is not perfect and i will probably need to work on the doors as well, but i will do that AFTER the windscreen will be finally installed.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.